Spinneret For Melt Blown Spinneret

Payment Type: L/C,T/T
Incoterm: FOB,CFR,EXW
Min. Order: 1 Set/Sets
Delivery Time: 30 Days

Basic Info

Model No.: customized

Additional Info

Packaging: carton or wooden box

Productivity: 100,000

Brand: JIER

Transportation: Ocean,Land

Place of Origin: CHANGZHOU

Supply Ability: 100,000

Certificate: ISO9001

HS Code: 8448202000

Port: Shanghai,Qingdao,Ningbo

Product Description

                                    Product description                                        

Main Features:

After the spinning components are removed from the production line, they should be cleaned and maintained in time. Main cleaning process: decomposition vacuum forging ultrasonic cleaning inspection repair protection treatment.

Vacuum forging furnace is used. First, the temperature rises to 290 degrees for about two hours. Then the temperature rises to 420-480 degrees. The treatment time is 3 hours. At the same time, the vacuum pump is started. The vacuum was started for 2.5 hours and then stopped and began to cool down to the furnace temperature of 52 C. It takes about 8-10 hours to complete the calcination.






melt blown spinnerets


Each set includes: air knives 2 pcs, spinning board1pc, distribution plate 1pc, deflector 1pc, Side plates 2pcs, feed connector 1pc, Intake connector 2pcs and aluminum washers 3pcs. The screws are all 12.9 high strength bolts.



                                            Specification                                            

                                                                    Accuracy of Spinneret


                                                      Surface Roughness of Spinneret Hole(ISO)

                                                                                                   countersink                     N5-N7

                                                                                     counterbore                    N3-N6

                                                                                     transition angle               N2-N6

                                                                                     capillary                         N1-N3

                                                                                     mirror finish by buffing    N1

                                                                                     mat finish by lapping       N2-N4



                                                   Tolerance of capillary and Round Hole Spinneret


Melt blown spinneret size

Aperture

Φ0.06~φ0.1

Φ0.15

(L/D)

20times

30over 30 times

Maximum number of holes / inch

127

85

Length can be customized according to customer requirement

                                                      FAQ                                                  

Q: Are you trading company or manufacturer ?

A: We are factory. And we can supply spinning packs according to your requirements.

Q: How long is your delivery time?

A: Generally it is 30 working days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for extra charge and do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance after the goods have been manufactured. We will arrange the shipment after your payment.
If you have another question, please feel free to contact .

© 2019 CHINA WAY. All Rights Reserved.  Changzhou Jier Precision Machinery Manufacturing Co., Ltd.,  Inc.   All rights reserved. site map.  sitemap.html